Phones answered 24/7Spartanburg, SC
Call (833) 490-5225
Phones answered 24/7Call any time(833) 490-5225
Guide

What to ask before a water damage company starts work

Questions to ask before a water damage company starts work in South Carolina: credentials, a written scope, readings, removals and who answers the phone.

Illustration for the guide "What to ask before a water damage company starts work" (Spartanburg, SC)
Short answer

Water damage work should be hired on paper. The right company shows its credentials, its scope and its readings in writing before any equipment goes into the house. This guide lists the questions to ask, explains what each answer should contain and notes which state agency issues the trade licenses that some work requires.

Key takeaways

  • Ask for a company's credentials in writing and check what each one covers.
  • Some work needs other state licenses, such as residential builder or HVAC, depending on what is being done.
  • Ask for a written scope before equipment is placed, with the materials, the removals and the visits listed.
  • A company should explain its drying readings and show you where they were taken.
  • Ask who will be on the site, who answers the phone and who is responsible for the work.
  • Keep the scope, the photographs and the readings together, because they are the record of the job.

Credentials: what to ask and how to read the answer

Credentials should be named, dated and checked. A company that cannot say what its licenses or registrations cover is not yet a company you can compare.

Ask for the company's name as it appears on each license or registration, the number and what the credential covers. Check the name against the paperwork you have, and make sure the business that signs the scope is the business that holds the credentials. A name that differs slightly from the record deserves a question.

Some work requires state licenses beyond any general one. Depending on the job, a company may need a residential builder license or an HVAC license, and the South Carolina Department of Labor, Licensing and Regulation is the state agency that issues those. Ask which of these apply to the work in front of you and which ones the company holds.

This guide makes no claim about a water-restoration-specific license in South Carolina. If a company names one, ask for its number and the agency that issued it, and check it yourself rather than relying on the company's word alone.

The written scope and what it must list

A scope is the plan the company will follow, written before equipment goes in. It lists the stages, the materials, the removals and the visits, so you can check the work against it.

A complete scope starts with the emergency stage, then lists the areas affected, the materials to be removed, the materials to be dried in place and the equipment that will be used. It names the expected visits and the readings that will end the drying, and it says what will be photographed and when.

Look for what is missing. A scope with no equipment may mean the company expects the structure to dry without it. A scope with no removal list may mean removals will be decided on site. A scope with no readings plan leaves you with no way to tell when the work is done.

Ask for changes in writing as well. When the crew finds more damage, the new line should come with a reason, a photograph and your approval before that work continues. That rule protects both the owner and the company.

Readings, visits and how drying ends

Drying ends when readings reach target, not when the floor looks dry. A company should explain the readings it takes and show where they were recorded.

Ask where the readings will be taken and how often they will be recorded. A good company can name the points, show the numbers from one visit to the next and explain the target for each material. If the answer is only a general timeframe, ask for the readings that will end the drying instead.

Visits should follow the readings. A company that visits on a fixed schedule without reading the structure is not measuring the work. Ask how many visits are planned, what each one checks and whether the crew will reopen any area that is not drying as expected.

Keep the readings with the scope and the photographs. Together they show what was found, what was done and when the drying ended, and they make any later question easier to answer.

Who answers the phone and who does the work

Ask who takes the call, who visits the property and who is responsible for the work. Those are separate questions, and the answers should be clear before anything is signed.

The business that handles intake may not be the business that does the physical work. Ask which company is responsible for the work on the site and who will sign the scope. Get the name of the crew lead and a way to reach that person directly.

Ask how the company handles changes in the middle of a job, who approves them and how you will be told. Ask whether any part of the work will be subcontracted, and if it is, who is responsible for that work and for its records.

The answers to these questions belong in writing. A clear chain of responsibility makes it easier to resolve a problem, to file a claim and to know whom to call the next morning.

Insurance, records and what to keep

A company should be able to show its insurance and should keep records you can take to your insurer. Those records matter as much as the work itself.

Ask the company to describe its liability and workers' compensation coverage, and ask for a certificate or written confirmation. Check that the coverage is current and that it names the company that will do the work on the site.

Keep the scope, the change orders, the photographs, the readings and the removal list. Ask for copies at the end of each visit so the record is not held by a single party. An insurer will ask for the same things, so having them in hand lets the claim be explained from the record.

Do not sign a completion statement until the readings show the structure is back to target and the removals are recorded. A completion statement is a record of what was done, and it should match what actually happened in the house.

Asking the first questions on the phone

The first call can cover most of the questions in this guide. The answers should be clear enough that you can compare two companies on the same facts.

When you call (833) 490-5225, someone picks up and takes the details. The intake will tell you what happens next and what the crew will need. Ask who will do the work, how the scope is written and where the readings will be kept. Write those answers in your notes.

Ask every company you call how it writes its scope, who signs it and what its readings will show. Write the answers down before you compare them. Phones are answered at any hour, so these questions can be asked late at night if the water is still rising.

Once you have the answers, compare them with the list in this guide. A company that answers plainly and in writing is one you can check. A company that will not give its credentials or its scope in writing is one to set aside, however confident its promises sound.

Comparing two companies on the same facts

When two companies come to the same house, the fair comparison is the scope, the readings and the removals, not the headline. Put the two documents side by side and read them line by line.

Start with the list of stages. Does each company describe emergency work, removal, drying and cleaning, in that order, and say what each stage includes? A company that skips a stage or lumps several together may still do the work, but you will have no way to confirm it was done.

Next compare the removals. Two companies may disagree about a single material, such as a pad, a section of drywall or a piece of trim, and that difference is where the real comparison lies. Ask each company to explain why it chose its line, and what reading or inspection would change its mind.

Finish with the readings and the visits. A company that names its targets, its measurement points and the readings that will end the drying gives you a record you can check. A company that offers only general reassurance gives you nothing to hold it to, and that is the difference that matters most after the work is done.

Also compare how each company handles a problem it did not expect. Ask what it does when the readings stall, when a material is worse than it looked, or when the owner disagrees with a removal. The answer tells you how the company keeps the record honest when the work does not go to plan, and that is often where two proposals differ the most.

Frequently asked questions

Can I trust a company a friend recommended?

A referral is a starting point. Check the credentials, ask for the written scope and read the readings plan before you rely on the company.

Should I sign a contract on the first visit?

Take the scope home and read it. A company that presses for a signature before the scope is written is one to question.

What is a change order?

A written addition to the scope for work the crew finds once it has started, such as an opened wall. It should describe the reason, the location and the photograph, and you should approve it before that work is done.

Do I need to check the company's license myself?

Yes. Ask for the number, the name on the record and the agency that issued it, then check it with that agency rather than relying on the company's word.

What if the work is not finished when the crew leaves?

Ask for the readings that show what remains and the date of the next visit. Keep a record of what was done so far, so the next stage starts from the same facts.

Should I choose the company that visits first?

Not on that basis alone. A first visit shows how a company works, but the written scope and the readings plan show what it will do. Compare those before you decide.

What should I do if I cannot get a written scope?

Treat that as the most important answer you have. Without a written scope, the stages, removals and readings cannot be checked, and the record of the job will depend on the company's word alone. Keep looking until a company will put the plan on paper.

Is a company with more crew members always the better choice?

Not necessarily. Crew size says little about the scope, the readings and the record. Ask who will visit the house, how the work is supervised and how the company keeps its paperwork, and judge the answers against the written plan.

This guide is general information for Spartanburg County homeowners, not a substitute for an on-site inspection. Prices are estimates. See our disclaimer.

Still stuck? We pick up 24/7.

If it's an emergency, call now. For non-urgent help, send the form and we'll call you back.

Keep reading

More guides

WhatsApp